Hello,
We create a materials document, and after that, in transaction MIRO
I put A01, R02 and put the number of the materials document, as reference.
It takes all the information from it, but ONLY the Ext. amount LC stays 0.00.
How can I make this field fill with the amount from the reference materials document?
Thanks a lot in advance
Ilian