Hi All
I am having difficulty with configuring the 313 2-step movement.
My test set up is as detailed below
I wish to move stock from Storage bin 'Bin-01' to storage bin 'ZZ-1'
When I process the 313 movement using MB1B (Plant 1000, Sloc 0001) the stock is picked and confirmed correctly using LB10 and then LT12. So far, so good!
Then I use MB1B mvt 315 (plant 1000, Sloc 0200) and then LB10. In LB10 I select the storage bin ZZ-1 from storage type 52M and all goes through OK. I then go to confirm using LT12. The source bin 921 TRANSFER and the destination bin ZZ-1 are shown, so I process and it goes through OK.
However, when I go to LS24 to see if stock moved I see the stock in 921 TRANSFER even though I have just confirmed the destination bin as ZZ-1.
Why would this happen?
Regards
Darren