Hi,
I am trying to find a way to ensure that settlement of cost from a sender to a receiver is done based on each line item in the sender.
Currently if I have $20 in cost element 7000, and another $30 in the same cost element (i.e.) 7000. The settlement in the receiver shows $50 in cost element 7000.
Is it possible to see $20 and $30 as separate line items in the receiver instead of a lump sum of $50.
Your response will be highly appreciated.